Construction of a 12-million gallon peak day water treatment plant expansion, including construction of new flash mix, flocculation, sedimentation and filter structures; re-work of existing piping in Plants A, B and C; addition of new variable frequency driven raw water turbine pumps; addition of water troughs and tube settlers for existing Plant C; modifications to existing chemical feed systems; addition and replacement of electrical source equipment; modifications to existing sludge holding tank; removal of two existing circular steel aboveground clearwells and slabs; removal of existing pumps and equipment; construction of a new fiber optic control loop over the plant site; computerization of controls; and yard piping, paving, manholes, site grading and seeding.
