Water Treatment Plant Expansion - Contract B

Owner

Harpeth Valley Utility District
P.O. Box 210319
Nashville, Tennessee 37221
Mr. John Barnes
(615) 356-6905

Engineer

Jordan Jones & Goulding, Inc.
6801 Governors Lake
Norcross, Georgia 30078
Mr. David Haas
(770) 455-8555

Contract Amount

$9,052,461.00

Year Completed

2002

Contract Time

480 Days

Actual Completion Time

480 days

Extra Claims Amount

$30,938.00

Construction of a 12-million gallon peak day water treatment plant expansion, including construction of new flash mix, flocculation, sedimentation and filter structures; re-work of existing piping in Plants A, B and C; addition of new variable frequency driven raw water turbine pumps; addition of water troughs and tube settlers for existing Plant C; modifications to existing chemical feed systems; addition and replacement of electrical source equipment; modifications to existing sludge holding tank; removal of two existing circular steel aboveground clearwells and slabs; removal of existing pumps and equipment; construction of a new fiber optic control loop over the plant site; computerization of controls; and yard piping, paving, manholes, site grading and seeding.

Home · Who We Are · What We Do · Workplace · Projects · Safety · Affiliates · Contact Us
Copyright © 2003-2007 W. Rogers Company. All rights reserved. · Site Map